Acomb |
---|
Date: 07 December 1901
New machinery installed at Acomb Colliery included a double-ram pump capable of pumping 40,000 gallons of water per hour.
|
This is how the standard text on the page will be seen.
Acomb |
---|
Date: 07 December 1901
New machinery installed at Acomb Colliery included a double-ram pump capable of pumping 40,000 gallons of water per hour.
|
Images are the property of the Heritage Centre Bellingham and may not be copied, printed or downloaded without permission.